Scheduling and Material Take-Off
We provide comprehensive scheduling and material take-offs services for the execution of rainscreen façade systems. Quantities are derived from coordinated technical drawings and digital models, supporting accurate planning, cost control, and material optimisation.
Where BIM models are used, material schedules are directly linked to the construction model, enabling change tracking, automatic quantity updates, and improved coordination between design, procurement, and installation.
Reliable and Auditable Quantity Information
Quantity take-offs by material type and component.
Component schedules with reference codes.
Surface area calculations for panels.
Preliminary cost assessments based on defined materials.
Our Process
Project review and façade system analysis.
Quantity extraction from 2D drawings or BIM models.
Preparation of material schedules with reference coding.
Technical review and delivery in editable formats or PDF.